Case studies

What a deployment looked like from the inside: the plan, the surprises, and what the numbers were afterwards. Written for the people who will run the next one.

Health system · Fieldmesh

Great Lakes Health: four telemetry networks into one

22,000 devices across 14 campuses in six weeks. The hardest part was the inventory, not the network.

Read the case study
Public health · Fieldmesh

A county cold chain with zero unexplained excursions

74 sites, 22 with unreliable connectivity, and precautionary stock discards down 61 percent.

Read the case study
Heart failure · Axon Sense

Six weeks at home after discharge

How the Great Lakes Health heart failure clinic built a monitoring program around one nurse's phone call.

Read the story
Emergency medical services · Nexa Edge

Sending the ECG ahead on the North Shore

11 of 13 heart attacks with the cath lab activated before the ambulance arrived.

Read the story
Critical access hospital · Fieldmesh

31 hours offline with nothing lost

An ice storm, a severed fiber line, and 1.4 million readings reconciled in 38 minutes.

Read the story
Research · Axon Sense and Lattice Bench

A pediatric sleep study moves home

Enrollment more than doubled once families no longer had to travel.

Read the story

Results at a glance

OrganizationProductsScaleHeadline result
Great Lakes HealthFieldmesh, Formcloud14 campuses, 21,940 devices4 networks retired, no clinical downtime
County public health departmentFieldmesh E-series74 sites, 310 units0 unexplained excursions
Great Lakes Health heart failure clinicAxon Sense, Nexa EdgeAbout 900 patients a yearReadmission results due 2027
North Shore volunteer ambulance serviceNexa Edge Vehicle2 ambulances, 212 transmissions26-minute median door-to-artery time
Cascade UniversityAxon Sense, Lattice Bench LB-3268 children, 14 nights eachEnrollment up from 31 to 68

Want to talk to a customer?

Most of the organizations here have agreed to take a call from a peer considering the same thing. Your account team can set it up.